Calabria Plaza and torch
 
  
Friar Development Center
 
  
​​

​Architect: SYMMES MAINI & McKEE ASSOCIATES

Construction:

 

Completion: January 2017

Arthur F. and Patricia Ryan Center for Business Studies


​5/8/2017 - ​​​​PC celebrates the formal dedication of the Arthur & Patricia Ryan Center for Business Studies.

dedicationryanbell.jpg
Arthur F. Ryan ’63 & ’90Hon. laughs with his classmate, Kevin J. Phelan ’66 & ’15Hon., as he rings a bell to symbolize the opening of the business school building. 



Ryan-Center-Dedicationweb.jpg 

​​

1/24/2017 - The soft opening of the Arthur & Patricia Ryan Center for Business Studies was attended by many.  Fr. Brian Shanley, President, Dr. Hugh Lena, Provost and Dr. Sylvia Maxfield, Dean of ​​​​School of Business led the event. A formal Grand Opening and Dedication ceremony is scheduled for April 29, 2017.

Ryan_Center_soft_open_shanleyweb.jpgRyan_Center_soft_openmaxfieldweb.jpg

Ryan_Center_soft_open_web.jpgRyan_Center_soft_open_web2.jpg 

1/17/2017 - It's officially open for classes.  From its incredible atrium to its state-of-the-art classrooms, the Ryan Center for Business Studies is spectacular.

atrium1.jpgatrium2.jpg

atrium3.jpgatrium4.jpg
 

atrium5.jpgatrium6.jpg 

finance-labIMG_1841.jpg

classroom1pan.jpg 

12/21/2016 - Hard at work outfitting, classrooms, offices and last minute touches on interior spaces for classes set to begin on January 17, 2017.


Complete with site Christmas tree this classroom is finished awaiting final furniture.  Monitors are up in our data labs. With monitors and floor to ceiling white boards these classrooms allow for easy group collaboration.

classroomcarpeted.jpgfinancelabmonitors.jpg 

New offices are being outfitted with new furniture.

officewithfurnitureweb.jpg
 

officenofurntiure.jpg 

The atrium shows off the wood accented Dore Hall windows and ceiling panels. – Looking west, the new steel arch is accented by the College’s eternal flame. From different angles the flame has orange, red, and blue hues to mimic that of a real torch.

PCSBinteriorwood.jpgflame.jpg 

12/06/2016 - Large lecture hall is taking shape and almost ready for a coat of paint while second floor classroom is the first to be carpeted.

​​​Ryan-Ctrlecturehallweb.jpgryancenterclassroomweb.jpg​​​​

11/22/2016 - Gothic Arch Installed

 

The “gothic arch” installed at the west entrance of the new Arthur and Patricia Ryan School for Business Studies was designed with a couple of different purposes in mind.  The architects at SMMA, while designing the building, were looking for a way to link the traditional  gothic architecture of Harkins Hall with the more contemporary design of what will become the signature building of the newly integrated  east campus.  The Ryan School of Business’ tower at the west entry along with the newly installed gothic arch, continues the design rhythm of Harkins Hall that the architects in 1917 used to inspire the most iconic building on the campus. ​​The arch at the Ryan Center is a free standing 18 foot wide structure standing 30 feet high and weighing approximately 5 tons.  It will serve as the location for the building name​​ which will be installed within the coming week.  The arch outline will be lit with “LED”  lighting concealed in the steel flange facing west. 


 

ryancenterflamearchweb.jpg

11/03/16 - ​Mill work panels are being ins​talled along the addition's second floor.  The curtain wall for the finance lab and mesa continues.

A view of the millwork from below in the science complexSouth foundation wall in Albertus Hall

9/30/2016 - Fr. Shanley and Cabinet members tour the  site with Mark Rapoza and Tim Carraher, Dimeo Construction.

Fr. Shanley tours the construction siteConstruction site tour by Fr. Shalney

Construction site tour by Fr. ShalneyConstruction site tour by Fr. Shalney

9/8/2016 - Arthur & Patricia Ryan Center for  Business Studies - ​Drywall is up and offices are taking shape on Dore's second floor​

Ryan Center Interior Shot 1

​8/26/2016 - A mixture of old and new at the Ryan Center for Business Studies.   The original brick work will also be seen in the interior of the building as well.  A blending of the old brick and the new glass will make for another great ​addition to the campus. 

​​Ryan Center Business Studies 1ryannorth3web.jpg

8/25/2016 - ​Exciting changes happening on east campus. The glass wall is in place on the back side of the Center for Business Studies.  An outside patio area will also be constructed here, complete with access to take-out window from cafe.

Ryan Center Interior Shot 2 Ryan Center Interior Shot 3 

Second floor bridge photos show all the amazing light that will be in the building from the many sky lights.  You can see the rounded portion of the building when looking up from the second floor.

Ryan Center Interior Shot 4 Ryan Center Interior Shot 5 ​

8/5/2016 - Standing on second floor bridge looking north you feel dwarfed by the side of the halo skylights.  This space will be flooded with natural light.  Looking south from the bridge, framing of classrooms is coming together.

​​Looking north from Atrium bridge​

Ryan Center Business Studies 2

Looking south from Atrium bridge.

Ryan Center Business Studies 3 

​A view of the north Atrium wall.  You can see what will be the finance lab and skylight behind.​​​

Atrium and Patricia Ryan Center

 Dimeo works to put in place one of the skylights for the Atrium.

Ryan CenterSkylight Atrium

7 /8/2016 - Starting to take shape.

Ryan Center Business Studies 4

7/8/2016 - View from the second floor above main entrance.  Second floor classrooms are being framed. 

Ryan Center Business Studies 5  

Ryan Center Business Studies 6 Ryan Center Business Studies 7 

5/18/2016 - Panaromic view of the atrium under construction.

Ryan Center Business Studies 8

Halo skylights cut in above the main entrance.

Ryan Center Business Studies 9 

4/25/2016 - Topping Off Ceremony a big success.

Ryan Center Business Studies 10 Ryan Center Business Studies 11

Ryan Center Business Studies 12 Ryan Center Business Studies 13

Ryan Center Business Studies 14 Ryan Center Business Studies 15

Ryan Center Business Studies 16 Ryan Center Business Studies 17

Signing of the Ryan Beams
 

Ryan Center
 

Ryan Center 

4/15/2016 - Arthur & Patricia Ryan School of Business Studies

Providence

4/7/ 2016 - The steel at the Arthur & Patricia Ryan Center for Business Studies is going up fast.  The Topping-Off ceremony is scheduled for April 15.

First steel of the Ryan Center 

3/11/2016 - Steel started going up on Monday at the Arthur & Patricia Ryan Center for Business Studies and the atrium is already taking shape (Picture 1).  The crane starts to shake out the first structural steel delivery in the lay down area.  The white columns will be erected to create the finance trading room and above mesa (Picture 2).
additional styles

PCSB steel

In addition to the steel work that started on Monday with the framing of the atrium, much work is being done inside.  Existing floors are beng demoed and new doorways created.
PCSB flooring
PCSB Doorways
11/18/2015 - New roadway is in place to keep vehicular traffic around the site​ flowing.
business school road map
10/5/2015 - A Beacon of Innovation- PC breaks ground​ on new School of Business
Groundbreaking at the PCSB
9/11/2015 - Interior Dore Hall demolition is almost complete.

Business school gift  

1/13/2015 - PC is starting the new year off with a major gift for the Business School.​